Newy 87.8 FM Playing The Music You Know And Love
play_arrowJim’s Dairy Delites: Newcastle’s Historic Milk Bar SOLD and Undergoing Restoration Newy Staff
today7 March 2025

newy.com.au – Motorists travelling through Hexham should prepare for changed traffic conditions on Maitland Road as work continues on the Hexham Straight Widening project. The adjustments are aimed at minimising disruptions while ensuring progress on the vital infrastructure upgrade.
To reduce the impact on daily commuters, the works will take place overnight from 7pm to 5am. Key changes include:
A temporary speed limit of 60km/h will remain in place throughout the work zone during daytime operations, with a further reduction to 40km/h overnight.
Oversize and overmass (OSOM) operators should note that the project operates on UHF channel 45, and vehicles requiring a permit must strictly adhere to their approved routes.
Work hours will be:
Motorists are urged to follow traffic control instructions, allow extra travel time of up to 15 minutes, and consider alternative routes where possible.
Transport for NSW appreciates drivers’ patience during these essential upgrades. For real-time updates, visit Live Traffic NSW or download the Live Traffic NSW app.



Written by: Newy Staff
© 2014 - 2026 Newy News | newy.com.au | Newcastle NSW Australia